Initial Site Development for Primary Road and Major Utilities – South Dhahran Housing Ownership (SDHO-1), Dhahran

Civil & Building

Saudi Aramco

Design and construction of storm water drainage system, temporary and permanent TSE pipelines, roadways, sanitary water system, potable water and fire system, irrigation distribution system, 13.8 kV electrical distribution system including unit substations and fiber optic cables, telecommunication backbone, sleeves for future use, temporary drainage and erosion control, all temporary construction facilities required to perform the work, demolition of existing test pipeline, temporary access roads, temporary and permanent percolation ponds, and remediation of the area of the existing percolation ponds and adjacent area.